The metal additive manufacturing company Velo3D has reported improvements in first-attempt build success and engineering preparation time after integrating PanOptimization’s PanX simulation into its production workflow. In a customer programme involving large copper-nickel components, 11 of 12 builds succeeded on their first attempt, while the company says the remaining build was completed successfully after a second attempt.
The trial used Velo3D’s eight-laser Sapphire XC platform and covered 33 customer geometries across 12 builds, representing 1,756 hours of printing. Those figures describe the specific programme reported on 19 November rather than a general success rate across all machines, materials or production sites. The customer has not been identified in the announcement, limiting independent assessment of the component acceptance criteria.
Laser powder bed fusion creates a metal component by melting selected regions of successive powder layers. As the deposited material heats and cools, differences in temperature produce expansion, contraction and residual stress. The resulting distortion can move a surface away from its intended dimensions or change how the part is supported during a long build. Those effects become expensive when a large component occupies an industrial machine for many hours before a problem is detected.
An unsuccessful build can consume powder, inspection capacity and hundreds of hours of machine availability. Reworking support structures or compensating for deformation may also require specialist engineering time before the next attempt. The ability to estimate distortion during print preparation gives production engineers a means to adjust geometry or supports before committing to the machine, although a simulated result still requires confirmation through physical builds.
PanOptimization’s PanX software models deformation and supports compensation decisions. Velo3D says it has integrated the tool with its print preparation and calibration workflow so that CAD geometry, support structures and process information can pass through without extensive manual rebuilding. Predicted deformation is then used to change the planned geometry or setup, with measured builds providing feedback on whether the resulting part conforms to its tolerances.
In the copper-nickel customer programme, Velo3D estimates that simulation and distortion compensation previously demanded four to 40 hours of hands-on engineering per build. PanX integration reduced that figure to less than one hour per build, according to its report. The saving concerns engineers’ active preparation time; the company has not claimed that laser exposure, post-processing or the full production cycle fell by an equivalent amount.
The company also described a separate demonstration using a microturbine engine core approximately 13 by 14 by 17 inches in size. Following one round of simulation-based compensation, reported peak dimensional deviation fell from plus 2.0 and minus 1.9 millimetres to plus 0.7 and minus 0.6 millimetres. Velo3D characterised the change as a 65% reduction and said the compensated part met its specified dimensional tolerances.
The dimensional test was separate from the 12-build customer programme. Its reported peak deviations illustrate the result for that microturbine geometry, not a general tolerance for the Sapphire XC platform. A full assessment would also require the measurement locations, acceptance criteria, material condition and any post-processing steps. Those details matter when moving from a successful demonstration to repeatable production of regulated or highly stressed components.
Improved predictions can reduce the number of physical iterations needed to establish a production route. Engineers may still have to confirm powder quality, fusion parameters, support removal, heat treatment and inspection requirements, particularly where components are intended for regulated aerospace or industrial service. A simulation that predicts shape correction cannot by itself certify material properties or the fitness of a component for use.
Prediction accuracy depends on calibration against the machine, alloy and process in use. Changes in thermal response, support stiffness, powder behaviour or heat flow can undermine a compensation model developed for another build. Velo3D says its calibration process incorporates production data and in situ thermal measurements to refine simulation inputs. Those measured data provide a basis for updating the model rather than assuming that a good result transfers unchanged between jobs.
Velo3D presented the findings at ASTM International’s ICAM 2026 event in Orlando in a session with PanOptimization. The data cover a customer production programme rather than a single benchmark part, but the customer has not been named and the account does not disclose the acceptance records for every geometry. The results therefore describe the programme reported, not an independently established success rate across all Velo3D installations.
The company says the PanX workflow has made distortion compensation feasible in less than an hour of active engineering time for the builds examined, alongside 11 first-attempt successes from 12 customer builds. Reproduction of those results in additional alloys, part geometries and production settings will determine how widely the reported efficiency gains can be applied.