Nelipak invests £480,000 in Derry skills

Nelipak invests £480,000 in Derry skills

Nelipak is investing £480k in skills at its Derry plant. The programme runs for three years and covers advanced manufacturing, data analytics, management and leadership as the medical packaging site targets higher productivity.


Nelipak is investing £480,000 in skills at its Derry medical packaging plant, where training in advanced manufacturing, data analytics, management and leadership will run over three years as the operation seeks higher productivity from its existing production base.

Invest Northern Ireland has offered £135,000 towards the programme, leaving Nelipak to fund most of the investment itself across a Campsie workforce of more than 300 people. The site produces flexible packaging including breather bags, pouches and medical roll stock for pharmaceutical and medical device customers in European and Asian markets.

Modern packaging lines generate process data, maintenance records, quality information and equipment alarms throughout production, but those signals only improve output when operators and engineers can connect them with the behaviour of the line. Repeated stops, changes in sealing performance or rising scrap rates can indicate a persistent process problem long before the overall production figure shows a substantial loss.

Medical packaging limits how aggressively a plant can respond because the package contributes directly to product protection. Films, papers and porous materials have to be converted and sealed within defined operating conditions, while dimensions, sealing surfaces and material characteristics must remain consistent enough for downstream filling, sterilisation or automated packaging operations.

A faster line therefore delivers little additional capacity when increased speed creates more scrap, rework or quality investigations, making stable yield as important as nominal machine rate. Production data can show whether losses are concentrated around a particular material, machine setting, changeover or maintenance condition, allowing engineering work to be directed towards the recurring cause rather than the latest symptom.

Advanced manufacturing training will sit alongside the data work, linking equipment operation, digital systems, maintenance and quality control across the plant. As packaging machinery becomes more automated, operators work increasingly through recipes, sensors, control interfaces and electronic production records, while mechanical adjustments still affect how material behaves as it moves through the process.

Changes in film specification, line speed or sealing conditions can alter several parameters at once, so a workforce needs enough process knowledge to recognise when an adjustment has moved beyond the normal operating range. Automation can reproduce the correct process very consistently, but it can reproduce an incorrect setting just as consistently when the underlying problem is not identified.

The Campsie plant already has a strong productivity record within the wider Nelipak group, according to Invest NI, and the new programme is intended to develop that capability as customer requirements and production technology evolve. Higher output has to be achieved while preserving the controls expected in pharmaceutical and medical device supply chains, where a defect may only become visible after packaging has left the converter.

Roll stock provides a clear example because material produced in Derry may later run through another company’s automated equipment, with its dimensions and sealing characteristics affecting performance downstream. Small variations during conversion can cause jams, poor seals or inconsistent package integrity later in the process, increasing the cost of a fault that was created much earlier in the supply chain.

Management and leadership training forms part of the same investment because maintenance priorities, staffing, changeovers, quality checks and production schedules cut across several functions. An improvement developed on one shift can disappear quickly when supervisors do not convert it into a standard method used consistently across the plant.

Running the programme over three years gives Nelipak time to spread new methods across different roles and shifts instead of concentrating expertise among a small group of specialists. Operators, engineers, maintenance teams and line managers all influence whether a process remains stable, so productivity gains are harder to sustain when only one part of that group has been trained to use the new systems.

Invest NI has supported the Derry operation previously through employment, skills and efficiency programmes, and its latest contribution covers less than a third of the total investment. Nelipak’s larger financial commitment places the programme inside the plant’s operating strategy rather than treating it as a short external training exercise.

As regulated manufacturers try to increase output without adding equivalent floor space or machinery, production knowledge and process discipline can determine how much capacity existing assets actually deliver. Nelipak’s investment will be reflected in scrap, downtime, process stability and useful output over the next three years, with any sustained improvement dependent on maintaining the quality controls required by its customers.


Stories for you