Volvo begins humanoid robot training at Ghent factory

Volvo begins humanoid robot training at Ghent factory

Volvo Cars is training humanoid robots at its Ghent factory. Hexagon’s AEON robots are learning precise component placement ahead of a planned factory pilot and potential production deployment from mid-2027.


Volvo Cars has begun training Hexagon Robotics' AEON humanoid robots at its vehicle manufacturing plant in Ghent, Belgium, initially concentrating on the precise placement of components within industrial fixtures. The programme is intended to establish whether mobile robotic equipment can support repetitive and ergonomically demanding work alongside existing factory automation.

Ghent is the first Volvo Cars manufacturing facility to evaluate humanoid robots. Volvo's own manufacturing personnel are working with Hexagon Robotics to train and validate the systems on industrial tasks. Additional robots are expected to arrive during the first half of 2027 for an expanded factory pilot, with the company targeting their introduction into actual production activities from the middle of the year.

The current training exercise requires the robots to place components into two fixtures. Subsequent tasks will extend to the handling of multiple parts, movement through production areas and interaction with established automated equipment. The initial exercise provides a relatively defined environment in which Volvo can assess the manipulation capabilities of the robots before introducing more variable operating conditions.

Volvo is using imitation learning, a technique through which robotic systems develop task execution models from examples of an operation performed by a human. Unlike programming a conventional robot to follow a fully specified series of movements, imitation learning derives elements of the required behaviour from demonstration data. The trained system then has to reproduce the operation under the conditions encountered during validation.

Fixture placement demands more than moving a component approximately to the correct location. The robot must recognise the part, determine its orientation, establish an appropriate grasp and position it relative to the locating features of the fixture. Differences between the position assumed by the control system and the actual part position can prevent the part from seating correctly. Variation in component position or the grasp itself must therefore be accommodated by the system.

AEON uses a wheeled mobile base rather than a pair of walking legs, coupled with an articulated upper body. Hexagon combines spatial perception, precision measurement, multiple sensing modalities and motion control within the platform. The wheeled base enables movement between workstations, while manipulation depends on the robot's ability to establish its position relative to the equipment and objects around it.

Hexagon's current product specification gives a continuous carrying capacity of 8kg and a short-term payload of 15kg. The company also specifies automatic battery replacement and up to four hours of operation per charge. These are platform specifications rather than results measured during the Ghent trials. The effective payload and operating time for an industrial application depend on the movements, tools, duty cycle and other requirements of the particular task.

Other developers are investigating similar configurations, including the wheeled AIR factory robot unveiled by Embodied AI earlier this month. An automotive production facility imposes constraints on mobile robots that differ from those encountered by fixed industrial manipulators. Equipment installed within a dedicated cell can operate relative to a defined machine coordinate system and established fixtures. A mobile platform must establish that relationship at each work location. Small differences in its stopping position can affect the reach and orientation of the manipulator, requiring suitable perception and control to align the robot with the task.

The planned progression towards multiple-component handling will introduce additional variability. Different parts can have different geometries, centres of mass and gripping requirements, even when they are delivered to a common workstation. Training examples must represent the operating conditions the robot is expected to encounter, while validation has to establish whether its behaviour remains reliable when those conditions change.

The intended interaction with existing automated systems creates further integration requirements. A robot placing a component into a fixture must coordinate its movements with the equipment using that fixture, including the signals indicating when the workstation is available and when placement is complete. Factory personnel also need appropriate procedures for handling failed placements, unavailable components and interruptions to the production process.

Safety assessment remains necessary when the mobile platform operates near people or other machinery. The availability of sensing and perception technology does not itself demonstrate that a complete robotic application satisfies the relevant safety requirements. The factory installation must be assessed in relation to its actual working environment, including the movements of the manipulator and the equipment with which it interacts.

Volvo has not published results for the robots' task completion times, reliability or productivity at Ghent. The expanded pilot will allow these characteristics to be evaluated across a wider range of activities before any regular production deployment. The mid-2027 target is conditional on the outcome of this development and validation work, rather than confirmation that the robots have already entered Volvo's production processes.


Stories for you